TWO ROCKS MARINA DEMOLITION AND INSTALLATION OF PORALU FLOATING PONTOON SYSTEMS

 

TWO ROCKS WA

Shorewater Marine was engaged by The Department of Transport to complete the design and construction of 2 new Poralu floating pontoon systems and the demolition of the existing P jetty within the Two Rocks Marina. 

The scope of works included, but were not limited to the following; Trenching of on-shore services, such as water, electrical/communications infrastructure and supply lines, Pile driving and load testing, traffic management, and detailed reporting. 

1/3
  • Facebook Social Icon

© 2016 by Shorewater Marine Pty Ltd